News

Assistance at the Secaucus Pumping Station, United Water New Jersey

The construction of a new entrance ramp for the New Jersey Turnpike in Secaucus, NJ has required the relocation of the existing 24 inch diameter suction and discharge piping. The existing reinforced concrete pipe will be replaced with new 24 inch ductile iron pipe in a new alignment and installed in 42 inch diameter casing pipes. BS&J is preparing the design for the new suction and discharge piping to and from the station.


headHomeheadNewsheadAboutheadProjectsheadServicesheadCareersheadLinksheadContact