News

United Water Toms River - Holly Pumping Station

BS&J is proceeding with the design and permitting of a replacement to the existing Holly Pumping Station.  The two existing horizontal centrifugal pumps will be replaced with three new vertical turbine pumping units in a new location but within an existing building that is being upgraded as the new station.  The total pumping capacity will be increased from 4 to 6 MGD.


headHomeheadNewsheadAboutheadProjectsheadServicesheadCareersheadLinksheadContact