SUEZ Water New York Inc. – Regular Dam Inspections (June 2019)

Posted on: June 27, 2019

BS&J conducted the regular dam inspections at four dams together with SWNY. Reports were written for each dam listing existing conditions, observations, and recommendations.

SUEZ Water New York Inc. – Grandview Wells Water Treatment (June 2019)

Posted on: June 21, 2019

Construction was completed on an updated water treatment process for two wells including a new building, treatment vessels, and 16-inch diameter ductile iron pipe for chlorine contact time. BS&J completed the design and provided engineering services during construction, testing, start-up, and completion certification to the local Department of Health.

Buck, Seifert and Jost is sad to announce the passing of former president Guido von Autenried (June 4, 2019)

Posted on: June 5, 2019

Guido von Autenried passed away on Tuesday, June 4th at home with his loving wife at his side. He was born in 1972 in Lauterbach, Germany. His father was a civil engineer and his mother was an English teacher. He grew up in Berlin and was drafted into the German army at age 16. After… Continue Reading

SUEZ Water New Jersey Inc. and SUEZ Water New York Inc. – Bridge Crossings (June 2019)

Posted on: June 1, 2019

Buck, Seifert & Jost, Inc., has successfully designed, attained applicable permits, inspected, and closed-out various water main replacement projects on bridge crossings in both New York and New Jersey. Each project was a unique design challenge requiring interfacing and coordination with different owners, government regulating agencies, railroads including CSX and NJ Transit, bridge designers, bridge… Continue Reading