Suez Water Westchester – Eastchester Rd Water Main Design and Construction Inspection Services (June 2016)

Posted on: June 2, 2016

Approximately 2,800 linear feet of 16 inch diameter water main installation to replace an existing 12 inch water main along a heavily traveled thoroughfare in Eastchester required design, permitting, and constructions services provided by BS&J. Meeting the aggressive project schedule to design, construct, and place in service within six (6) months was a critical project… Continue Reading

Suez Water Rahway – Asset Management Plan (June 2016)

Posted on: June 1, 2016

BS&J is preparing an Asset Management Plan for Suez Water Rahway. Components of the plan include: conducting an asset inventory and condition assessment, establishing the required level of service, identifying critical assets, preparing life cycle costs, developing a long-term funding strategy, and summarizing this information in an asset management report.